Free factory layout design with every equipment order Get Free Layout →
Home / Beverage Lines
Turnkey Line Solutions

Turnkey Beverage Production Line Solutions

Complete filling lines engineered around the product you make — bottled water, carbonated drinks, beer and spirits, juice and tea, and edible oil. Every solution shows the process flow and the equipment list.

Production lines

5 applications

water · soda · beer · juice · oil

Containers

PET · glass · can

and 5-gallon barrels

Line scope

Water to pallet

treatment to palletizing

Every project

Free layout

test run and training

✓ Engineering consultation ✓ Free plant layout ✓ Workshop test run
Quick Comparison

Which Filling Principle Fits Your Drink?

A filling machine only works for the drinks it was designed for — a water filler cannot fill soda, and a vacuum filler cannot fill carbonated drinks.

Still, mineral or sparkling waterFilling principleAtmospheric / gravityTypical containersPET · glass · cans · 5-gallonOur solutionBottled Water Lines →
Juice, tea, RTD coffee, functional drinksFilling principleNegative pressure (vacuum); hot fill or aseptic cold fillTypical containersPET · glass · cansOur solutionJuice & Tea Lines →
Cola, soda, energy and tonic drinksFilling principleCounter-pressure (isobaric)Typical containersPET · glass · cansOur solutionCarbonated Beverage Lines →
BeerFilling principleCounter-pressureTypical containersGlass bottles · cansOur solutionBeer & Alcohol Lines →
Vodka, whisky and other still spiritsFilling principleMicro negative pressureTypical containersGlass bottles · cansOur solutionBeer & Alcohol Lines →
Edible oil, sauces and other viscous liquidsFilling principlePiston fillingTypical containersPlastic · glass · jarsOur solutionEdible Oil Lines →
Complete Line Scope

From Raw Material to Palletized Cases

Every turnkey line follows the same backbone. The machines along it change with your drink.

1Product preparation
2Container supply
3Rinse · fill · cap
4Sterilize & cool (if needed)
5Label & code
6Pack & palletize

Every Linho line includes

Engineering consultation

The right configuration for your product, container and output — confirmed before you pay.

Free factory layout

Once the equipment is confirmed, we draw your plant layout at no charge.

Workshop test run

Every machine is run in our workshop (2–3 days) before it ships.

Installation & training

Our technicians install, commission and train your operators on site.

Free Line Proposal

Tell Us What You Want to Produce

Send your drink, container and target output. Our engineers reply within 1 working day with a preliminary line proposal.

What to send us

1

Your product

Beverage type and recipe. For water lines, your raw water source too.

2

Target output

Bottles or cans per hour, and how many shifts you plan to run.

3

Container samples

At least one bottle, cap and label (or can and lid). We build the machine to the samples.

4

Workshop & utilities

Workshop size, plus your voltage, frequency and number of phases, water and compressed air.







    🔒 Direct response from our engineers within 1 working day. Free plant layout drawing once the equipment is confirmed.

    Prefer to chat? WhatsApp us or write to info@linhomachine.com.